Lynemouth Biomass Plant

Client;

Sir Robert McAlpine Ltd
Lynemouth Biomass Plant

 

Project;

  • Provision of electrical installation works to Lynemouth Power Station, Ashington as it converted from Coal to Biomass
  • Project involved the road and rail delivery buildings, main storage silos and the large conveyor systems designed to handle and deliver the fuel as part of the impressive biomass delivery system.
  • The Power Station will make a significant contribution to the National Grid and increase the UK’s current power generation capacity by providing an addition of 390 megawatts of Low Carbon Electricity.

 

Scope;

  • Listec Temperature Measuring System
  • Fireworks Water Mist System
  • GreCon Trace Heating System
  • Land IR Detection Equipment
  • Listec Temperature Measuring System
  • UPS System
  • Rail offloading
  • Silo Discharge to all 6 Silos
  • Silo Foam Installation
  • Magnets
  • Solenoid Valves
  • Pull Keys
  • Lighting and small power

 

Value

£900,000K